Client: Vodárna Plzeň Completion: 2018 The subject of the contraction was the reconstruction of the two-pole steel bridge, each with a span of 66.0 m. The […]
Client: Municipality Hovorčovice Completion: 2019 Phase I: The project solves reconstruction of existing sidewalks along both sides of the third class road III/2438. Pedestrian crossings will […]
Client: KSÚS Středočeského kraje Completion: 2015 Milling the bituminous cover in thickness of 60 mm, local redevelopment of structural layers, asphalt levelling, laying of ACo 11 […]
Client: Road and motorway directorate of the Czech Republic Completion: 2016 Reconstruction of the bridge I/67 Karviná (ev. no. 67-013), which transfers road I/67 over the railway […]
Client: KSÚS Středočeského kraje Completion: 2015 Grinding of the existing bitumen cover in a thickness of 40 mm, leveling, jointing and laying ACo 11 (bitumen – asphalt […]
Client: KSÚS Středočeského kraje Completion: 2015 Demolition of original steel-concrete bridge deck. Adjusting communications of category S7,5 on the bridge and its surroundings with a total area […]
Client: Krajská správa a údržba silnic Středočeského kraje Completion: 2015 The scope of the contract was repair of 2nd class roads, between the villages of Březno […]
Client: KSÚS Středočeského kraje Completion: 2015 Demolition of the original bridge no. 1185 with monolithic reinforced concrete foundation slab, which are fixed to the monolithic reinforced concrete […]
Client: Obec Chotíkov Completion 2012 This represents the reconstruction of asphalt roads, with a total area of 6950 m2, located in the Municipality of Chotíkov. The […]
Client: The Municipality of Slaný Completion 2011 The Construction of the Year 2012 in the Central Bohemia Region This project, which was awarded for being the […]