Client: CENTRAL GROUP Completion: 2020 The underground reinforced concrete structure of the residual technologies building has the shape of a block with basic dimensions of 26.4 […]
Client: City Dobříš Completion: 2020 Reconstruction of a multifunctional building from 1982, which includes a sports hall, gym, restaurant and city library. The subject of the […]
Client: SCONTO Immobilien, s.r.o. Completion: 2020 The subject of the contract was a general delivery of the reconstruction of the SCONTO shopping center. The shopping centre […]
Client: Central Group Completion: 2020 The proposed L-shaped apartment building is made up of two simple six-storey wings with a receding last floor. The building has […]
Client: Municipality Beroun Completion: 2020 On 24. 9. 2018 we had the honour to tap the foundation stone of the new building “Extension – Elementary school […]
Client: City part Prague 14 Completion: 2019 The extension of the elementary school is situated in the courtyard, immediately adjoining the existing building of the school […]
Client: Charles University, FACULTY OF PHYSICAL EDUCATION AND SPORT Completion: 2019 Subject of the contract was a reconstruction of the lecture hall and its reconstruction into a […]
Client: Národní památkový ústav Completion: 2017 The former riding hall currently serves as an exposition and hall for organizing concerts, promotions, conferences and other cultural events. […]
Client: Private Client Completion: 2018 The subject of the contract was a construction of storage boxes, drying halls and warehouse halls, including their roofing. Further, the […]
Client: Municipality Kněžmost Completion: 2019 Two new school pavilions are interconnected by a connecting neck, in which the main entrance and open aula is placed. To […]
Client: ALUFIX Bohemia, spol. s.r.o. Completion: 2018 The project deals with the demolition of existing buildings in the area of the original agricultural cooperative, connected with […]
Client: JOKEY Praha CZ, a.s. Completion: 2018 The construction of the production hall is situated in the alcove of the existing premises of the company.
Client: Municipality Loděnice Completion: 2017 The project consists of superstructure of a school building, adjusting the surfaces in the dining room and building a new staircase. […]
Client: City Dobříš Completion: 2018 Company POHL cz, a.s. in cooperation with company TREPART s.r.o. finished a reconstruction of elementary school in Dobríš. Primarily it was […]
Client: DYNEX TECHNOLOGIES Completion: 2018 The new building is situated in the existing area of the company, on the site of the original agricultural object steel […]
Client: Private Client Completion: 2018 In May 2017 launched our company a new project called Top Trans Headquarters. It is a reconstruction and extension of the […]
Client: City Hovorčovice Completion: 2017 In October 2016 company POHL cz, a.s. began new construction of elementary school in city Hovorčovice. End of the works is […]
Client: National Institute for Historical Heritage Completion 2016 On the beginning of December 2016 company POHL cz, a.s. completed a project of interior rehabilitation of Guided […]
Client: Administration of National Park and Nature Conservation Area Šumava Completion 2015 One-storey partially basement passive house built with an area of 297 m2. The house […]
Client: Czech Univeristy of Life Sciences Completion 2015 Construction of new university building in the vicinity of existing building of Faculty of Forestry. Each floor will […]
Client: Town Český Krumlov Completion 2014 Reconstruction of former monastery of St. Klara. Compound of the monastery is registered in the Central list of cultural monuments […]
Client: The City of Pilsen Completion 2014 This is the new building of the Kindergarten in Pilsen – Černice; a two-storey brick building with a flat […]
Client: The Central Bohemia Region Completion 2012 The project also dealt with the reconstruction of the former basic school, which now functions as a Grammar School […]
Client: The Municipality of Poběžovice Completion 2012 The project comprised the building of a new kindergarten in Pobežovice, including the reconstruction of existing premises of the […]
Client: Kladno Regional Hospital, Central Bohemia Region Hospital Completion 2012 The Best Construction of 2013 in the Central Bohemian Region The Reconstruction of the pavilion that […]
Client: The Zoological and Botanical Garden in Pilsen Completion 2010 The construction of 14 buildings of which 12 are pavilions of the “African Savannah”, the “African […]
Client: Obec Rynholec Completion 2010 The construction work for the already existing nursery school consisted of the implementation of the new above-ground parts of the building […]