Ušovický Stream – Mariánské Lázně, River km 5.00 to 6.31 – repairs and adjustments

The Revitalisation of the Historic Centre of the Town of Slaný
21.3.2017
Sewer System and Sewage Treatment Plant in the Štěpánkovice township
21.3.2017

Completion: 2011

Client:
Povodí Vltavy, a State Enterprise

The POHL cz, a.s. structure “Úšovický Creek – Mariánské Lázně” received a special commendation at the WATER BUILDING OF THE YEAR competition, which is awarded each year by the Svaz vodního hospodářství (Water Management Association, SVH) and the Sdružení oboru vodovodů a kanalizací ČR (Association of Water Mains and Sewer Systems of the Czech Republic, SOVAK).

The investor was Povodí Vltavy, a government enterprise, and our company was the contractor. The project consisted of eliminating alluvium, underbrush, and stumps within the flow profile, as well as repair to the damaged bottom construction, walls, and load-bearing elements of the basin.

The honours were given to the representatives of our company by the director of the Water Protection Department Ing. Hana Randová (Ministry of Environment), chief director of the Water Management Section RNDr. Pavel Punčochář, CSc. (Minstry of Agriculture), chair of SOVAK Ing. František Barák, chair of SVH Ing. Miroslav Nováček, and chair of the board of VRV a.s. Ing. Jan Plechatý.