Client: Obec Rynholec

Completion 2010



The construction work for the already existing nursery school consisted of the implementation of the new above-ground parts of the building complex together with the kindergarten classrooms (including the plumbing, the electricity and the gas for the already existing reinforced concrete basement). The original aboveground area of the classroom pavilion was demolished. The above-ground parts were designed predominantly as one-storey structures, while only a lesser part of the facilities are located on the 2nd above-ground floor. The floors will eventually be connected by means of an internal double staircase. The classroom pavilion will also be connected to the distribution of electricity, water, gas, all of which terminate in the cafeteria.