Client: Vodárna Plzeň

Completion: 2018


The subject of the contraction was the reconstruction of the two-pole steel bridge, each with a span of 66.0 m. The supporting structure consists of two identical steel dismountable trusses, with adjustments for permanent road traffic.

The reconstruction of the bridge consisted gradually in:

  • removing of existing bituminous road
  • cutting off and breaking down the side of the pavement towards the road
  • rehabilitation of the pavement surface and dismantling steel entry wedges
  • implementing a new waterproofing bridge
  • renovation of the walkway
  • adjusting and lubricating bridge bearings and cleaning the bottom structure