Olovnice sewage treatment plant, sewer system, and water supply system – Phases I and II
7.3.2017
Reconstruction of the sewer system and renewal of water lines, Za Strahovem street and surroundings, Prague 6
7.3.2017
Show all

Client: Město Opava

Completion 2009



The structure erected was designed to increase the capacity of the existing channel for transporting hundred-year old waters, riprap, tiles, and rubble masonry, the replacement of access bridges and footwalks to the property, the construction of a new bridge. Part of the water works included repair of the regulation and intake structure, relay of engineering networks crossing the water flow, and removal of trees and shrubbery.