Client: Obec Olovnice
Completion 2009
A waste treatment plant with 1300 EO capacity was erected in the muddy floodplain of a creek where we had to grapple with an unbearable substrate and a high level of underground water, 3 m under whose surface built the foundation for the entire structure.In comparison with this the construction of sewer and water supply systems in the rest of the township was a simple, routine matter.