TOPTRANS Headquarters
6.6.2017
Attic superstructure and reconstruction of apartment building Pštrossova
8.3.2017
Show all

Client: Vodárny Kladno – Mělník a.s

Completion: 2017


Construction of a pressure sewerage in the total length of the main and secondary rows of more than 7 km with the installation of a domestic pumping tanks. Part of this construction is also a new WWTP.

The total cost of the work exceeds CZK 38 million excl. VAT. The construction is carried out in joint venture with Geosan Group, a.s.