Completion 2011



The construction, the installation, the craft-work and the supplies associated with the removal of sediment from the flood area of Babylon Pond – a total area of 50,280 m³. Bank reinforcement, the repair of the dam – rockfill of quarry stone with filling of joints in a total volume of 327m³ (2000m²). The reconstruction of building units – the gullet, the spillway and the dividing object in the watercourse of the Teplá Bystřice River.