Client: KSÚS Středočeského kraje

Completion: 2015


Grinding of the existing bitumen cover in a thickness of 40 mm, leveling, jointing and laying ACo 11 (bitumen – asphalt concrete) in the thickness of 40 mm (3,868 m2). After milling and embedding of transverse and longitudinal cracks, the height adjustment of drainage seals, inlets and engineering caps was made. Horizontal traffic signing carried out.