III/1185 Podlesí, reconstruction of bridge no. 1185-8

II/280 Březno – crossroad with III/2805
8.3.2017
Chotíkov – The Reconstruction of Local Roads (additional construction works)
8.3.2017
Show all

Client: KSÚS Středočeského kraje

Completion: 2015


Demolition of the original bridge no. 1185 with monolithic reinforced concrete foundation slab, which are fixed to the monolithic reinforced concrete abutments. Deck consists of prefabricated panels coupled to a monolithic reinforced concrete slab. The length of span construction is 3.08 m.