Enhancing the Capacity of the Barrandov Interceptor
8.3.2017
The Restoration of the Water Mains on Vyšehradská Street in Prague 2
8.3.2017
Show all

Client: Povodí Vltavy, státní podnik

Completion 2013


The project includes the modification and enhancing the capacity of Předenický Stream within the flood control measures in the total length of 0.7085 km.

Of which: open riverbed in a length of 0.352 km and 0.3565 km of the watercourse running through the pipelines.