Client: City part Prague 14

Completion: 2019


The extension of the elementary school is situated in the courtyard, immediately adjoining the existing building of the school to form one operational unit. Overall, the object is divided into the upper part where the gym is located, and the lower part with a flat roof with extensive green.

The existing boiler room will be removed. Thanks to this, it is possible to create a completely new barrier-free entrance to the premises of the school from the eastern side, with a representative and safe pre-entry area adjoining the sidewalk in Šimanovská Street.