Dry retention reservoir Loděnice
9.10.2017
Show all

DCIM100MEDIADJI_0015.JPG

Client: Povodí Odry, státní podnik

Completion: 2019


Realization of a dry retention reservoir in order to reduce flood flows and flow of sediment and to protect the Karlovice municipality from the negative effects of floods caused by torrential rainfall.
The construction consists mainly of landscaping, construction of a 16m high non-homogeneous dam with an injecting screen, an associated building, a waste channel, a service road, an emergency spillway, revitalization treatments in the floodplain and around the tank.

Construction was made in the Joint Venture of companies Metrostav a.s., OHL ŽS a.s. and POHL cz, a.s.