The Boiler Plant in Úterý
8.3.2017
III/0066 Hostouň – reconstruction of bridge no. 0066-3
8.3.2017
Show all

Client: Power plant Opatovice nad Labem

Completion: 2016


In 2016 company POHL cz, a.s. built a bridge over the Labe river. Span of the bridge is more than 105 meters. The bridge connects a power plant with nearby waste disposal od fly ash.