Client: SKANSKA a.s. Division of Structural Engineering
Completion 2010
This project included the construction or the reconstruction of eight stop-logs chambers DN 300 – DN 2100, the relocation of sewer DN 400 over a length of 125 m, the reconstruction of the water supply mains DN 150 over a length of 45 m and the construction of the structural elements needed for the installation of mobile barriers. The construction and the reconstruction of stop-logs chambers were carried out using mining methods.